I entered data for the wrong date, how do I fix it?

Correct an entry on the wrong date

  1. Check whether the row is staged, saved pending or committed.
  2. Remove an unsaved staged row before changing the date.
  3. For a saved pending row, use the available edit/delete action. Before re-entering on another date, verify the old row was removed.
  4. For a finalized report, give an authorized administrator the project, date, row and correct facts. Normal editing is locked; do not assume a generic Unlock button exists.
  5. After an authorized correction, check the source report and affected exports or cost evidence for that project/date.

Finalized delivery-only and no-work attestations cannot be changed through normal entry. Do not create duplicate hours, costs or deliveries to compensate for a wrong date.