A daily report captures all work activities for a specific date on a construction project. It includes:
• **Labor entries** – Worker hours and overtime
• **Equipment entries** – Equipment usage hours
• **Materials** – Materials used on site
• **Subcontractors** – Subcontractor work and hours
• **Production** – Work quantities completed
• **Notes** – Site conditions, issues, observations
• **Documents** – Photos, drawings, permits
After saving the rows and reviewing the day, select Finalize Report. Finalization confirms all six sections together, including empty ones; separate tab confirmations are optional. The requirements for the day type must also be met.