How do I link daily entries to a work order?

Linking Entries to a Work Order

There are three ways entries appear in a WO report:

1. Manual — Select WO during data entry

On the Labor, Equipment, Materials, or Subcontractor tabs, choose the WO from the Work Order dropdown before confirming. The entry links directly.

2. Automatic — Activity code match

If the WO has an activity code set, any committed entry using the same activity code automatically appears in the WO report.

3. Nightly auto-tag

TCC runs a nightly batch that scans daily notes and subcontractor descriptions for keyword matches against active WOs. Matched entries appear with an amber "Auto-detected" badge in the report.

Splitting hours

If a worker spent 8 hours regular and 4 hours on extra work, create two entries: one without WO (regular) and one with the WO selected (extra work).

Back to Work Orders